Utility Solutions Projects

Infants and Juniors Toilet Refurbishment

PROJECT OVERVIEW

The full refurbishment of 4No. toilets, works complete; asbestos survey, water sampling, plumbing and electrical first fix through to completion, HW cylinder installation, White Rock hygienic wall cladding, installation of cubicles and duct panelling.

Working to a strict seven-week programme to meet the client’s deadline.

Client: London Borough of Bexley
Location: Crook Log Primary School, Bexleyheath, DA6 8EQ

Full Plant Refurbishment

PROJECT OVERVIEW

The full refurbishment of plant room; all equipment renewed, including custom made flue and pipework. All works carried out during school’s term hours.

Client: Haringey Council
Location: Park View Secondary School, London, N15 3QR

Sanitaryware Installation

PROJECT OVERVIEW

The mechanical first and second fix of all sanitaryware and supply and installation of 3No. hot water cylinders for first team changing rooms and function space at Snodland Town FC.

Client: Sponsorship
Location
: Snodland Town Football Club, Kent, ME6 5DL

Full Plant Refurbishment

PROJECT OVERVIEW

The full refurbishment of plant room; all equipment renewed, including all pipework.

All works carried out at reduced hours due to schools’ operational requirements.

Client: Haringey Council
Location: Ferry Lane Primary School, London, N17 9PS

Full Heating Refurbishment

PROJECT OVERVIEW

Inclusive of 60No. Heat emitters and full heating pipework replacement throughout building. Carried out over two phases. All works carried out at reduced hours due to schools’ operational requirements.

Client: Haringey Council
Location: Ferry Lane Primary School, London, N17 9PS

Pipework Renewal

PROJECT OVERVIEW

Replacement of heating pipework in North Wing location. Installation of new 4’’ heating flow and return pipework from beneath podium floor up onto the west facing wall. Adaptations to existing pipework for new installation.
All works carried out at reduced hours due to schools’ operational requirements.

Client: Haringey Council
Location
: Fortismere Secondary School, London, N10 1NS

Full School Plant Refurbishment

PROJECT OVERVIEW

Inclusive of site set up and supply of temporary plant, 3No. plant room fit outs and 1No. plant decommission/rip out, including all pipework. All works carried out at reduced hours due to schools’ operational requirements.

Client: Haringey Council
Location: Mulberry Primary School, London, N17 9RB

Full Plant Refurbishment

PROJECT OVERVIEW

The full refurbishment of plant room; all equipment renewed, including BMS and pipework. All works carried out during school’s term hours.

Client: Haringey Council
Location
: Highgate Primary School, London, N6 4ED

Boiler Replacement Programme

PROJECT OVERVIEW
The contract comprised of all elements from the replacement survey to aftercare. Combi, Heat only and System boilers formed part of the replacement contract.

Remove, upgrade and replace antiquated systems; inclusive of removing and replacing all pipework and radiators where necessary. All making good works carried out by our in-house team.

Client: One Housing Group
Location: Various, London

Heating/Hot Water Refurbishment

PROJECT OVERVIEW
The installation of new microbore heating circuit and 3No. LST radiators, as-well as the installation of new customise made thermal storage unit to 90No. flats across three blocks.

Client: Anchor Hanover
Location: Keswick and Beaumont Lodge Retirement Homes

Plant Room Refurbishment and Domestic Valve Installation

PROJECT OVERVIEW
Domestic Flat Valve Installation

The full refurbishment of a high rise block plant room; all equipment renewed, including all pipework.

Client: Anise & Coriander Buildings
Location: 13 Shad Thames, London SE1

Greenwich University

PROJECT OVERVIEW
Working to a 10-week programme at the University of Greenwich to complete first and second fix on:

  • 68 en-suites
  • 13 kitchens
  • 2 DDA compliant en-suites

Location: Greenwich, SE London

Electrical Testing and Maintenance

PROJECT OVERVIEW
Plant annual ECIR testing inclusive of all reactive maintenance.

Client: Private Property Management Company